Category: Currently Selling Projects!
A new pre-construction condo development that will be located at 215 Lake Shore Boulevard East in Toronto (Lake Shore/Lower Jarvis). This will be 49 storeys with a total of 590 condo units. Estimated completion date is set for July 2022.
A new condo project that will be located at 3 Southvale Drive in Toronto. This project will be a 7 storey tower with 38 condo units. The estimated completion date is set for Spring/Summer 2019.
Lakeside Condos - The Park Suites Collection is a new pre-construction condo development by Greenland Group located at 215 Lake Shore Boulevard East in Toronto (Lake Shore/Lower Jarvis). Lakeside Condos - The Park Suites Collection will be 49 storeys with a total of 590 condo units. The Park …
Link 2 Condos and Lofts is a new condo, Loft and Garden project by ADI Development Group and is currently under construction. Link 2 Condos and Loftswill be located at Dundas St & Suttin Dr in Burlington. Link 2 Condos Burlington will be a 6 storeys high with …
U.C. Towns is a new semi-detached project by Tribute Communities. The U.C. Towns will be located at Winchester Road West & Simcoe Street North in Oshawa. U.C. Towns will have a collection of 481 units. The estimated completion date for U.C. Towns is built and ready for occupancy.